Complete Electrical Services – Synlait
Complete Electrical Services – Synlait

We designed the complete electrical system, to cater for shared services for the various process and building contractors and achieved an integrated result.

Dust Hazardous Area Upgrades – Maungaturoto
Dust Hazardous Area Upgrades – Maungaturoto

Over the course of 5 years, we classified hazardous areas and designed systems for the upgrading of hazardous area equipment and systems across the site.

Watercare Services – Mairangi Bay Wastewater Pumpstation
Watercare Services – Mairangi Bay Wastewater Pumpstation

The Sidmouth Street Mairangi Bay wastewater pumpstation is a Watercare key facility, collecting and pumping all the North Shore’s east coast bays sewage to the Rosedale treatment works.

Ammonia Engine Rooms Hazardous Areas
Ammonia Engine Rooms Hazardous Areas

We designed and implemented ammonia engine room hazardous area monitoring and control upgrades for 6 engine rooms across the Te Rapa site, implementing Fonterra’s strategy for standardised controls.

Dryer Safety Systems – Kauri
Dryer Safety Systems – Kauri

Modern dryer systems have intensive safety systems, owing to the significant risk of explosive conditions in their processes.

Gas Hazardous Areas – Kauri
Gas Hazardous Areas – Kauri

Natural Gas represents a significant risk across some industrial sites because mains gas is piped extensively and used for raising process steam and hot water in packaged boilers.

Lighting Control – Storage King
Lighting Control – Storage King

The building owner requested us to investigate the cause of unusually high electricity bills in this large multi-storey storage facility.

MCC Replacement – Kauri
MCC Replacement – Kauri

This project required replacement of the most critical switchboard on site within a 7 week shutdown, including associated building and HVAC upgrades.

MCC Replacement – Maungaturoto
MCC Replacement – Maungaturoto

The Whey Plant was automated, rewired and had the MCC’s replaced in 2009. Our scope included the design of the electrical services and associated work.

North Shore Hockey Stadium
North Shore Hockey Stadium

Redesigning site power distribution and ducting to enable main power, generator backup and supplies to lighting masts to be able to construct and maintain the system sensibly.