GRS Consulting

MCC Replacement – Maungaturoto

Electrical Engineering Auckland Case Studies GRS Consulting

Fonterra Maungaturoto Whey Plant MCC Replacement and Plant Rewire

The Whey Plant was automated, rewired and had the MCC’s replaced in 2009. Our scope included the design of the electrical services and associated work. We designed an MCC which was more spacious, cleaner, and more serviceable, with spare capacity. The switchgear migrated from three single sided boards to one double sided assembly. MCC ladderack was redesigned, and new runs into the plant provided more space and hygienic supports.

Electrical engineering design you can trust

Fonterra Maungaturoto MCC Replacement

MCC REPLACEMENT - MAUNGATUROTO

FONTERRA MAUNGATURO SITE

DAIRY INDUSTRY

POWER DISTRIBUTION AND MOTOR CONTROL

More Case Studies

Watercare Services – Mairangi Bay Wastewater Pumpstation
Watercare Services – Mairangi Bay Wastewater Pumpstation

The Sidmouth Street Mairangi Bay wastewater pumpstation is a Watercare key facility, collecting and pumping all the North Shore’s east coast bays sewage to the Rosedale treatment works.

Ammonia Engine Rooms Hazardous Areas
Ammonia Engine Rooms Hazardous Areas

We designed and implemented ammonia engine room hazardous area monitoring and control upgrades for 6 engine rooms across the Te Rapa site, implementing Fonterra’s strategy for standardised controls.

North Shore Hockey Stadium
North Shore Hockey Stadium

Redesigning site power distribution and ducting to enable main power, generator backup and supplies to lighting masts to be able to construct and maintain the system sensibly.